Renovation of dormitory buildings 8 & 11

Renovation of Buildings 8 & 11, including the complete dismantling of existing all materials and the construction of new bathrooms, new interior and exterior doors and ceramic tiles floors. Also new lighting fixtures and dyes, as well as the dismantling of existing hot water machinery and replacement with new energy-saving system compatible with DDC Control and use of presence detection thermostats.

  • LocationAmerican Base of Souda
  • CategoryBuilding, Roadwork, Energy
  • Contract OwnerUS Navy
  • Prime Contractor MICHAEL M. TSONTOS SA
  • Contractor MICHAEL M. TSONTOS SA
  • Participation 100%
  • Period of work time 01/2012 - 09/2013
  • Budget € 5.226.073,95
MICHAEL M. TSONTOS - CONSTRUCTION COMPANY