Installation of waste treatment of Kolymbari, Phase B’

Construction and completion of the 2nd phase of sewage treatment at the Biological Cleaning Plant in Gerani, with all the necessary building and electromechanical infrastructures required (ventilation, sedimentation, thickening, chlorination, centrifuge shaft well, washing machine, dehumidification building, suitable hydraulic networks, pumps, tables, etc.) and the integration and operation of seven new pumping stations along the North Axis Roadway, from Platanias to Kolymbari.

  • LocationGerani Municipality of Platanias, Chania
  • CategoryBuilding, Electromechanical
  • Contract OwnerDEVELOPMENT ORGANIZATION OF WEST CRETE
  • Prime Contractor MICHAEL M. TSONTOS SA
  • Contractor MICHAEL M. TSONTOS SA
  • Participation 100%
  • Period of work time 11/2006 - 12/2008
  • Budget € 2.852.731,00