Construction phase B of environmental engineering department buildings

Construction of a two-storey building and an additional mechanical floor, reinforced concrete structure, with a total surface area of 1950 m², that includes all architectural, building and E/M works.

  • LocationPolitechnoupoli, Chania
  • CategoryBuilding, Electromechanical
  • Contract OwnerDepartment of Technical Services of the Technical University of Crete
  • Prime Contractor JOIN VENTURE TOMES SA- MICHAEL M. TSONTSOS SA– NAOUM SA ΑΤΕ
  • Contractor MICHAEL M. TSONTOS SA
  • Participation 33,33%
  • Period of work time 09/2011 – 09/2013
  • Budget € 6.850.657,11
MICHAEL M. TSONTOS - CONSTRUCTION COMPANY
ΕΣΠΑ Banner