Installation of solar heating systems in dorms
Design and construction of solar heating systems in three dormitory buildings.
- LocationAmerican Base of Souda
- CategoryElectromechanical
- Contract OwnerUS Navy
- Prime Contractor MICHAEL M. TSONTOS SA
- Contractor MICHAEL M. TSONTOS SA
- Participation 100%
- Period of work time 09/2007 - 07/2008
- Budget € 258.329,56