Installation of solar panels

The project concerns the installation of solar panels power generation systems. Solar panels are installed over the roof of parking spaces and generate around 275,000 kWh per year. The entire system is connected to the central electricity grid of the Base.

  • LocationAmerican Base of Souda
  • CategoryBuilding, Electromechanical
  • Contract OwnerUS Navy
  • Prime Contractor MICHAEL M. TSONTOS SA
  • Contractor MICHAEL M. TSONTOS SA
  • Participation 100%
  • Period of work time 10/2010 - 04/2012
  • Budget $ 1.632.343,14
MICHAEL M. TSONTOS - CONSTRUCTION COMPANY
ΕΣΠΑ Banner